Abbasi, B.; Shadrokh, S.; Arkat, J. (2006), Bi-objective resource-constrained project scheduling with robustness and makespan criteria, Applied Mathematics and Computation. Vol. 180(1), pp. 146-152.
Ballestín, F.; Valls, V.; Quintanilla, S. (2008), Pre-emption in resource-constrained project scheduling, European Journal of Operational Research. Vol. 189(3), pp. 1136-1152.
Buddhakulsomsiri, J.; Kim, D. S. (2006), Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting, European Journal of Operational Research. Vol. 175(1), pp. 279-295.
Castejón-Limas, M.; Ordieres-Meré, J.; González-Marcos, A.; González-Castro, V. (2011), Effort estimates through project complexity, Annals of Operations research. Vol. 186(1), pp. 395-406.
Chen, J.; Askin, R. G. (2009), Project selection, scheduling and resource allocation with time dependent returns, European Journal of Operational Research. Vol. 193(1), pp. 23-34.
Chtourou, H.; Haouari, M. (2008), A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling, Computers & Industrial Engineering. Vol. 55(1), pp. 183-194.
Damay, J.; Quilliot, A.; Sanlaville, E. (2007), Linear programming based algorithms for preemptive and non-preemptive RCPSP, European Journal of Operational Research. Vol. 182(3), pp. 1012-1022.
Delgoshaei, A.; Ali, A. (2019), Review evolution of cellular manufacturing system’s approaches: Human resource planning method, Journal of Project Management. Vol. 4(1), pp. 31-42.
Delgoshaei, A.; Ali, A.; Ariffin, M. K. A.; Gomes, C. (2016a), A multi-period scheduling of dynamic cellular manufacturing systems in the presence of cost uncertainty, Computers & Industrial Engineering. Vol. 100, pp. 110-132.
Delgoshaei, A.; Ariffin, M.; Baharudin, B.; Leman, Z. (2015), Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms, International Journal of Industrial Engineering Computations. Vol. 6(4), pp. 503-520.
Delgoshaei, A.; Ariffin, M.; Baharudin, B.; Leman, Z. (2016b), A new method for decreasing cell-load variation in dynamic cellular manufacturing systems, International Journal of Industrial Engineering Computations. Vol. 7(1), pp. 83-110.
Delgoshaei, A.; Ariffin, M. K.; Baharudin, B. H. T. B.; Leman, Z. (2014), A Backward Approach for Maximizing Net Present Value of Multi-mode Pre-emptive Resource-Constrained Project Scheduling Problem with Discounted Cash Flows Using Simulated Annealing Algorithm, International Journal of Industrial Engineering and Management. Vol. 5(3), pp. 151-158.
Delgoshaei, A.; Ariffin, M. K. A.; Ali, A. (2017), A multi-period scheduling method for trading-off between skilled-workers allocation and outsource service usage in dynamic CMS, International Journal of Production Research. Vol. 55(4), pp. 997-1039.
Delgoshaei, A.; Ariffin, M. K. M.; Baharudin, B. H. T. (2016c), Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach, Journal of Industrial Engineering and Management. Vol. 9(3), pp. 732-785.
Delgoshaei, A.; Gomes, C. (2016), A multi-layer perceptron for scheduling cellular manufacturing systems in the presence of unreliable machines and uncertain cost, Applied Soft Computing. Vol. 49, pp. 27-55.
Delgoshaei, A.; Rabczuk, T.; Ali, A.; Ariffin, M. K. A. (2016d), An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources, Annals of Operations Research. Vol.259(1-2), pp. 1-33.
Hartmann, S.; Briskorn, D. (2010), A survey of variants and extensions of the resource-constrained project scheduling problem, European Journal of Operational Research. Vol. 207(1), pp. 1-14.
Hendricks, M. H.; Voeten, B.; Kroep, L. H. (2002), Human resource allocation in a multiproject research and development environment, Managing Multiple Projects. Planning, Scheduling, and Allocating Resources for Competitive Advantage. Vol. 17(3), pp.181-188.
Jarboui, B.; Damak, N.; Siarry, P.; Rebai, A. (2008), A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems, Applied Mathematics and Computation. Vol. 195(1), pp. 299-308.
Ke, H.; Liu, B. (2010), Fuzzy project scheduling problem and its hybrid intelligent algorithm, Applied Mathematical Modelling. Vol. 34(2), pp. 301-308.
Kim, K.; Yun, Y.; Yoon, J.; Gen, M.; Yamazaki, G. (2005), Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling, Computers in industry. Vol. 56(2), pp. 143-160.
Kolisch, R.; Drexl, A. (1997), Local search for nonpreemptive multi-mode resource-constrained project scheduling, IIE transactions. Vol. 29(11), pp. 987-999.
Kreter, S.; Rieck, J.; Zimmermann, J. (2016), Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars, European Journal of Operational Research. Vol. 251(2), pp. 387-403.
Laslo, Z. (2010), Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses, International Journal of Project Management. Vol. 28(6), pp. 609-618.
Lin, C.-M.; Gen, M. (2008), Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multiobjective hybrid genetic algorithm, Expert Systems with Applications. Vol. 34(4), pp. 2480-2490.
Mika, M.; Waligóra, G.; Węglarz, J. (2005), Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models, European Journal of Operational Research. Vol. 164(3), pp. 639-668.
Naber, A.; Kolisch, R. (2014), MIP models for resource-constrained project scheduling with flexible resource profiles, European Journal of Operational Research. Vol. 239(2), pp. 335-348.
Papke-Shields, K. E.; Boyer-Wright, K. M. (2017), Strategic planning characteristics applied to project management, International Journal of Project Management. Vol. 35(2), pp. 169-179.
Pérez, E.; Posada, M.; Lorenzana, A. (2016), Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms, Soft Computing. Vol. 20(5), pp. 1879-1896.
Rabbani, M.; Ravanbakhsh, M.; Farrokhi-Asl, H.; Taheri, M. (2017), Using metaheuristic algorithms for solving a hub location problem: application in passive optical network planning, International Journal of Supply and Operations Management. Vol. 4(1), pp. 15-32.
Seifi, M.; Tavakkoli-Moghaddam, R. (2008), A new bi-objective model for a multi-mode resource-constrained project scheduling problem with discounted cash flows and four payment models, Int. J. of Engineering, Transaction A: Basic. Vol. 21(4), pp. 347-360.
Sharon, A.; Dori, D. (2015), A Project–product model–based approach to planning work breakdown structures of complex system projects, IEEE Systems Journal. Vol. 9(2), pp. 366-376.
Vaez, P. (2017), A New Mathematical Model for Simultaneous Lot-sizing and Production Scheduling Problems Considering Earliness/Tardiness Penalties and Setup Costs, International Journal of Supply and Operations Management. Vol. 4(2), pp. 167-179.
Van de Vonder, S.; Demeulemeester, E.; Herroelen, W.; Leus, R. (2005), The use of buffers in project management: The trade-off between stability and makespan, International Journal of Production Economics. Vol. 97(2), pp. 227-240.
Van de Vonder, S.; Demeulemeester, E.; Herroelen, W.; Leus, R. (2006), The trade-off between stability and makespan in resource-constrained project scheduling, International Journal of Production Research. Vol. 44(2), pp. 215-236.
Van Peteghem, V.; Vanhoucke, M. (2010), A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem, European Journal of Operational Research. Vol. 201(2), pp. 409-418.
Vanhoucke, M.; Debels, D. (2008), The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects, Computers & Industrial Engineering. Vol. 54(1), pp. 140-154.
Ward, S.; Chapman, C. (2003), Transforming project risk management into project uncertainty management, International Journal of Project Management. Vol. 21(2), pp. 97-105.
Węglarz, J.; Józefowska, J.; Mika, M.; Waligóra, G. (2011), Project scheduling with finite or infinite number of activity processing modes–A survey, European Journal of Operational Research. Vol. 208(3), pp. 177-205.
Yan, L.; Jinsong, B.; Xiaofeng, H.; Ye, J. (2009), A heuristic project scheduling approach for quick response to maritime disaster rescue, International Journal of Project Management. Vol. 27(6), pp. 620-628.
Yu; Wang, S.; Wen, F.; Lai, K. K. (2012), Genetic algorithm-based multi-criteria project portfolio selection, Annals of Operations Research. Vol. 197(1), pp. 71-86.
Zhou, M.; Askin, R. G. (1998), Formation of general GT cells: an operation-based approach, Computers & industrial engineering. Vol. 34(1), pp. 147-157.
ZIAEE, M. (2017), Modeling and solving the distributed and flexible job shop scheduling problem with WIPs supply planning and bounded processing times. Vol.4(1) , pp. 78-89.