Aircraft Component Spare Parts Logistics and Operation Planning: A Case Study in FARSCO Aircraft MRO Center

Document Type : Case Study

Authors

Industrial engineering department, Yazd university, Yazd, Iran

Abstract

In this research, spare parts logistics in the aviation industry has been investigated. Since each aircraft consists of several components, the availability, ordering, and delivery of them are important during aircraft repair and maintenance operations and delays in supplying component spare parts will have a direct impact on the delivery of aircraft. This paper aims to optimize a supply of component spare parts using a programming model considering minimize the holding and purchasing costs. Moreover, two critical constraints including the purchase budget and repair capacity which are rarely mentioned in the previous papers have been noted in this research. FARSCO aviation maintenance & overhaul center as the biggest dedicated MRO center in the Middle East has been considered in this paper as the case study. Based on its capabilities, FARSCO provides services to all airlines and 90% of domestic airlines send their aircraft to this center for performing heavy checks and maintenance. The proposed model was verified and solved by using CPLEX solver and is constructed for the case by considering the numerical data. The results are obtained in two average demand and pessimistic modes (worst case scenario). Finally, a sensitivity analysis of the model is carried out to investigate the applicability of the problem. Results demonstrate the optimal number of maintenance jobs that can be completed to deliver at each period, as well as the order quantity of spare parts and the shortages of spare parts which are important for managers to deliver aircraft to the customers on time.

Keywords


Aviation week (2009). "MROs Race to Speed TAT," in "Aviation Weekly," [Online]. Available: http://www.aviationweek.com/aw/generic/story_channel.jsp.
 
B. Rupp, D. Pauli, S. Feller, and M. Skyttä, (2010).  Workshop scheduling in the MRO context. AIP Conference Proceedings, American Institute of Physics. Vol. 1281(1), pp.. 2000-2003.
 
P. B. Luh, D. Yu, S. Soorapanth, A. I. Khibnik, and R. Rajamani. (2005). A Lagrangian relaxation based approach to schedule asset overhaul and repair services, IEEE Transactions on Automation Science and Engineering, Vol. 2(2), pp. 145-157.
 
Taylor and Christensen. (2001). Airline Maintenance Resource Management. Society of Automotive Engineers. Published by SAE international with a product code of R-192. ISBN of 978-0-7680-0231-7, 218 pages.
 
D. P. Koumanakos. (2008). The effect of inventory management on firm performance. International journal of productivity and performance management.Vol.57 (5).pp. 355-369.
 
S.-J. Joo. (2009). scheduling preventive maintenance for modular designed components: A dynamic approach. European Journal of Operational Research, Vol. 192(2), pp. 512-520.
 
Jani Kilpia , Juuso Töylic, Ari Vepsäläinen. (2009). Cooperative strategies for the availability service of repairable aircraft components. International Journal of Production Economics, Vol. 117(2), PP 360-370.
 
S.-J. Joo and H. Min. (2011). A multiple objective approach to scheduling the preventive maintenance of modular aircraft components. International Journal of Services and Operations Management, Vol. 9(1), pp. 18-31.
 
J. Arts and S. D. Flapper. (2015). Aggregate overhaul and supply chain planning for retables. Annals of Operations Research journal, Vol. 224(1), pp. 77-100.
 
M. Erkoc and K. Ertogral. (2016). Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity. Journal of Computers & Industrial Engineering, Vol. 98, pp. 30-39.
 
D. H Ulker, M. Erkoc and K. Ertogral. (2015). A production scheduling model and analysis for the maintenance repair and overhaul service provider. Journal of Faculty of engineering and architecture of Gazi University. 30(3), pp. 513-522.
 
Olle Wijka, Patric Anderssona Jan Blockbc, Thord Righarda. (2017). Phase-out maintenance optimization for an aircraft fleet, International Journal of Production Economics, Vol.188. pp. 105-115.
 
Mansik Hura, Burcu B, Keskinb Charles, P. Schmidtb. (2018). End-of-life inventory control of aircraft spare parts under performance based logistics. International Journal of Production Economics, Vol.204, pp. 186-203.
 
Katarzyna Antosza R.M, Chandima Ratnaya keb. (2019). Spare parts’ criticality assessment and prioritization for enhancing manufacturing systems’ availability and reliability. Journal of Manufacturing Systems, Vol. 50, pp. 212-225.
 
Sarah Van der Auweraera and Robert Bouteab. (2019). Forecasting spare part demand using service maintenance information, International Journal of Production Economics, Vol. 213,  pp. 138-149.
 
Sarah Van der Auweraera, Robert N. Bouteab, Aris A. Syntetosc. (2019). forecasting spare part demand with installed base information: A review,  International Journal of Forecasting, Vol.35(1), pp.181-196.
Jing Chen, Oleg Gusikhin, William Finkenstaedt, Yu-Ning Liu. (2019). Maintenance, Repair, and Operations Parts Inventory Management in the Era of Industry. IFAC-Papers on Line, Vol.52 (13), pp. 171-176.
 
Hesham Al-Momania, Osama T.Al Meanazela, Ehsan .K waldehb. Abdallah Alaweena Atif Khasaleha Ahmad Qamara. (2020). the efficiency of using a tailored inventory management system in the military aviation industry, Heliyon journal, Vol.6 (7), e04424.
 
James Wakiruab, Liliane Pintelona, Peter N. Muchirib. (2021). Integrated remanufacturing, maintenance and spares policies towards life extension of a multi-component system, Reliability Engineering & System Safety, Vol. 215, 107872.
 
M. Ramaganesha, Ganapathiraju Vikas, Varmab T. Rajpradeesha, S. Bathrinatha. (2021). Spare parts ordering decisions using age based, block based and condition based replacement policies, Material todays proceeding, article in press.