Defining Robust Recovery Solutions for Preserving Service Quality during Rail/Metro Systems Failure

Document Type : Technical Note

Authors

1 Department of Civil, Architectural and Environmental Engineering, Federico II University of Naples, Naples, Italy

2 D’Appolonia S.p.A., Naples, Italy

3 Department of Engineering, University of Sannio, Benevento, Italy

Abstract

In this paper, we propose a sensitivity analysis for evaluating the effectiveness of recovery solutions in the case of disturbed rail operations. Indeed, when failures or breakdowns occur during daily service, new strategies have to be implemented so as to react appropriately and re-establish ordinary conditions as rapidly as possible. In this context, the use of rail simulation is vital: for each intervention strategy it provides the evaluation of interactions and performance analysis prior to actually implementing the corrective action. However, in most cases, simulation tasks are deterministic and fail to allow for the stochastic distribution of train performance and delays. Hence, the strategies adopted might not be robust enough to ensure effectiveness of the intervention. We therefore propose an off-line procedure for disruption management based on a microscopic and stochastic rail simulation which considers both service operation and travel demand. An application in the case of a real metro line in Naples (Italy) shows the benefits of the proposed approach in terms of service quality.

Keywords

Main Subjects


Barrena E., Canca D., Coelho L.C. and Laporte G. (2016). Single-line rail rapid transit timetabling under dynamic passenger demand. Transportation Research Part B, Vol. 70, pp. 134-150.
Botte M., Di Salvo C., Placido A., Montella B. and D’Acierno L. (2017). A Neighbourhood Search Algorithm for determining optimal intervention strategies in the case of metro system failures. International Journal of Transport Development and Integration, Vol 1, pp. 63-73.
Cacchiani V., Huisman D., Kidd M., Kroon L., Toth P., Veelenturf L. and Wagenaar J. (2014). An overview of recovery models and algorithms for real-time railway rescheduling. Transportation Research Part B, Vol. 63, pp. 15-37.
Cacchiani V., Caprara A. and Fischetti M. (2009). Robustness in Train Timetabling. European Journal of Operational Research, Vol. 219, pp. 727-737.
Cadarso L. and Marín A. (2011). Robust rolling stock in rapid transit networks. Computers & Operations Research, Vol. 38, pp. 1131-1142.
Cadarso L. and Marín A. (2014). Improving robustness of rolling stock circulations in rapid transit networks. Computers & Operations Research, Vol. 51, pp. 146-159.
Cantelmo G., Viti F., Tampére C.M.J., Cipriani E. and Nigro M. (2014). A two-step approach for the correction of the seed matrix in the dynamic demand estimation. Proceedings of the 93rd Annual Meeting of the Transportation Research Board, Washington (D.C.), USA, January 2014.
Cascetta E. (2009). Transportation systems analysis: Models and applications. New York (NY), USA: Springer.
CENELEC (1999). Railway applications - Specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS). EN50126. 
Corman F., D’Ariano A., Pacciarelli D. and Pranzo, M. (2010a). A Tabu Search algorithm for rerouting trains during rail operations. Transportation Research Part B, Vol. 44, pp. 175-192.
Corman F., D’Ariano A. and Hansen I.A. (2010b). Disruption handling in large railway networks. WIT Transactions on the Built Environment, Vol. 114, pp. 629-640.
Corman F., D’Ariano A., Hansen I.A. and Pacciarelli D. (2011). Optimal multi-class rescheduling of railway traffic. Journal of Rail Transport Planning & Management, Vol. 1, pp. 14-24.
Corman F. and D’Ariano A. (2012). Assessment of advanced dispatching measures for recovering disrupted railway traffic situations. Transportation Research Record, Vol. 2289, pp. 1-9.
Corman F., D’Ariano A., Pacciarelli D. and Pranzo M. (2012). Bi-objective conflict detection and resolution in railway traffic management. Transportation Research Part C, Vol. 20, pp. 79-94.
D’Acierno L., Gallo M., Montella B. and Placido A. (2013). The definition of a model framework for managing rail systems in the case of breakdowns. Proceedings of IEEE ITSC 2013 – 16th International IEEE Conference on Intelligent Transportation Systems, The Hague, The Netherlands, October 2013, pp. 1059-1064.
D’Acierno L., Gallo M. and Montella B. (2014). Application of metaheuristics to large-scale transportation problems. Lecture Notes in Computer Science, Vol. 8353, pp. 215-222.
D’Acierno L., Placido A., Botte M. and Montella B. (2016). A methodological approach for managing rail disruptions with different perspectives. International Journal of Mathematical Models and Methods in Applied Sciences, Vol. 10, pp. 80-86.
D’Ariano A. (2009). Innovative decision support system for railway traffic control. IEEE Intelligent Transportation Systems Magazine, Vol. 1, pp. 8-16.
De Fabris S., Longo G., Medeossi G. and Presenti R. (2014). Automatic generation of railway timetables based on a mesoscopic infrastructure model. Rail Transport Planning & Management, Vol. 4, pp. 2-13.
De Shutter B., Van den Boom T. and Hegyi A. (2002). Model predictive control approach for recovery from delays in railway systems. Transportation Research Record, Vol. 1793, pp. 15-20.
Dollevoet T., Huisman D., Schmidt M. and Schöbel, A.(2012). Delay management with rerouting of passengers. Transportation Science, Vol. 46, pp. 74-89.
Eickmann C., Kettner M. and Sewcyk B. (2003). Integrating microscopic and macroscopic models for railway network evaluation. Proceedings of ETC 2003 –European Transport Conference 2003, Strasbourg, France, October 2003.
haemi N., Goverde R.M.P. and Cats O. (2016). Railway disruption timetable: Short-turnings in case of complete blockage. Proceedings of 2016 IEEE International Conference on Intelligent Rail Transportation (ICIRT), Birmingham, UK, August 2016.
Goverde R.M.P. (2005). Punctuality of railway operations and timetable stability analysis. PhD thesis, TRAIL Thesis Series T2005/10, The Netherlands.
Hansen I.A. and Pachl J. (2008). Railway timetable and traffic. Hamburg, Germany: Eurailpress.
Kanai S., Shiina K., Harada S. and Tomii N. (2011). An optimal delay management algorithm from passengers’ viewpoints considering the whole railway network. Journal of Rail Transport Planning & Management, Vol. 1, pp. 25-37.
Kecman P., Corman F., D’Ariano A. and Goverde R.M.P. (2013). Rescheduling models for railway traffic management in large-scale networks. Public Transport, Vol. 5, pp. 95-123.
Kettner M. and Sewcyk B. (2002). A model for transportation planning and railway network evaluation”. Proceedings of the 9th World Congress on Intelligent Transport Systems, Chicago (IL), USA, 2002.
Kunimatsu T., Hirai C. and Tomii N. (2012). Train timetable evaluation from the viewpoint of passengers by microsimulation of train operation and passenger flow. Electrical Engineering in Japan, Vol. 181, pp. 51-62.
Marinov M. and Viegas J. (2011). A mesoscopic simulation modelling methodology for analyzing and evaluating freight train operations in a rail network. Simulation Modelling Practice and Theory, Vol. 19, pp. 516-539.
Marzano V., Papola A. and Simonelli F. (2008). Effectiveness of origin-destination matrix correction procedure using traffic counts. Transportation Research Record, Vol. 2085, pp. 57-66.
Mascis A. and Pacciarelli D. (2002). Job-shop scheduling with blocking and no-wait constraints. European Journal of Operational Research, Vol. 143, pp. 498-517.
Meng X., Jia L. and Qin Y. (2010). Train timetable optimizing and rescheduling based on improved particle swarm algorithm. Transportation Research Record, Vol. 2197, pp. 71-79.
Nash A. and Huerlimann D. (2004). Railroad simulation using Open-Track. WIT Transactions on The Built Environment, Vol. 74, pp.45-54.
Nash A., Weidmann U., Bollinger S., Luethi M. and Buchmueller S. (2006). Increasing schedule reliability on the S-Bahn in Zurich, Switzerland: Computer analysis and simulation. Transportation Research Record, Vol. 1955, pp. 17-25.
Pender B., Currie G., Delbosc A. and Shiwakoti N. (2013). If you fail to plan you plan to fail: a survey of passenger rail disruption recovery practices. Proceedings of the 92nd Annual Meeting of the Transportation Research Board, Washington (D.C.), USA, January 2013.
Placido A., Cadarso L. and D’Acierno L. (2014). Benefits of a combined micro-macro approach for managing rail systems in case of disruptions. Transportation Research Procedia, Vol. 3, pp. 195-204.
Placido A., D’Acierno L. and Botte M. (2015) Effects of stochasticity on recovery solutions in the case of high-density rail/metro networks. Proceedings of 6th International Conference on Railway Operations Modelling and Analysis – RailTokyo2015, Tokyo, Japan, March 2015.
Placido A. (2015). The definition of a model framework for the planning and the management phases of the rail system in any kind of service condition, PhD Thesis.
Pouryousef H. and Lautala P. (2015) Hybrid simulation approach for improving railway capacity and train schedules. Journal of Rail Transport Planning & Management. Vol. 5, pp. 211-224.
Prinz R., Sewcyk B. and Kettner M. (2001) NEMO: Network Evaluation Model for the Austrian railroad (ÖBB)”, Eisenbahntechnische Rundschau. Vol 50, pp. 117-121.
Quaglietta E., Corman F. and Goverde R.M.P. (2013). Impact of a stochastic and dynamic setting on the stability of railway dispatching solutions. Proceedings of IEEE ITSC 2013 – 16th International IEEE Conference on Intelligent Transportation Systems, The Hague, The Netherlands, October 2013, pp. 1035-1040.
Sato K., Tamura K. and Tomii N. (2013). A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers. Journal of Rail Transport Planning & Management. Vol. 3, pp. 38-53.
D'Acierno et al. Schmocker J., Cooper S. and Adeney W.E. (2005). Metro service delay recovery comparison of strategies and constraints across systems. Transportation Research Record, Vol. 1930, pp. 30-37.
Schöbel A. (2007). Integer programming approaches for solving the delay management problem. Lecture Notes in Computer Science, Vol. 4359, pp. 145-170.
Siefer T. and Radtke A. (2005). Railway simulation: key for better operation and optimal use of infrastructure”. Proceedings of the 1st International Seminar on Railway Operations Modelling and Analysis, Delft, The Netherlands, 2005.
Umiliacchi S., Nicholson G., Zhao N., Schmid F. and Roberts C. (2016). Delay management and energy consumption minimisation on a single-track railway. IET Intelligent Transport Systems, Vol. 10, pp. 50–57.
Veelenturf L.P., Kidd M.P., Cacchiani V., Kroon L.G. and Toth P. (2016). A railway timetable rescheduling approach for handling large scale disruptions. Transportation Science, Vol. 50, pp. 841-862.
Wardman M. (2004). Public transport values of time. Transport Policy, Vol. 11, pp. 363–377.