A. Allahverdi, FS.Al-Anzi. (2009) The two-stage assembly scheduling problem to minimize total completion time with setup times. Computers & Operations Research. Vol. 36, pp. 2740-2747.
A. Bachman, A. Janiak. (2004) Scheduling jobs with position-dependent processing times. Journal of Operational Research Society. Vol. 55, pp. 257-264.
A. Berrichi, L. Amodeo, F. Yalaoui, E. Chatelet, M. Mezghiche. (2008) Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem. Journal of Intelligent Manufacturing. Vol. 20, pp. 389–400.
AMA. Hariri, CN. Potts, (1997) A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research. Vol. 103, pp. 547-556.
B. Alidaee, N.K. Womer. (1999) Scheduling with time dependent processing times: review and extensions. Journal of the Operational Research Society. Vol. 50, pp. 711-720.
C. Oguz, MF. Ercan, TCE. Cheng, YF. Fung. (2003) Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. European Journal of Operational Research. Vol. 149, pp. 390-403.
C. Sun, K. Morizawa, H. Nagasawa. (2003) Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flow shop scheduling. European Journal of Operational Research. Vol. 146, pp. 498-516.
Ch. Koulamas, GJ. Kyparisis. (2001) The three-stage assembly flow shop scheduling problem. Computers & Operations Research, Vol. 28, pp. 689-704.
CN. Potts, SV. Sevast'Janov, VA. Strusevich, LN. Van Wassenhove, CM. Zwaneveld. (1995) The two-stage assembly scheduling problem: Complexity and approximation. Operations Research. Vol. 43, pp. 346-355.
CY. Lee, TCE. Cheng, BMT. Lin. (1993) Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science, Vol. 39, pp. 616-25.
D. Quadt, H. Kuhn. (2007) A taxonomy of flexible flow line scheduling procedures. European Journal of Operational Research. Vol. 178, pp. 686-698.
D. Yang, TCE. Cheng, S. Yang, Ch. Hsu. (2012) Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities. Computers & Operations Research. Vol. 39, pp. 1458-1464.
FS. Al-Anzi, A. Allahverdi, (2009) Heuristics for a two-stage assembly flow shop with bicriteria of maximum lateness and makespan. Computers & Operations Research. Vol. 36, pp. 2682-2689.
G. Mosheiov. (2001) Parallel machine scheduling with a learning effect. Operational Research Society. Vol. 52, pp. 1165-1169.
G. Schmidt. (2000) Scheduling with limited machine availability, European Journal of Operational Research. Vol. 121, pp. 1-15.
H. Chou-Jung Hsu. (2013) Single-Machine Scheduling with Aging Effects and Optional Maintenance Activity Considerations. Mathematical Problems in Engineering. DOI: 10.1155/2013/634503.
H. Mokhtari, M. Dadgar. (2015) A Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing. International Journal of Supply and Operations Management. Vol. 2(3), pp. 871-887.
J. Blazewicz, K. EckeK, E. Pesch, G. Schmidt, J. Weglarz. Handbook on Scheduling from Theory to Application. Springer, USA, 2007.
M. Elbounjimi, G. Abdul-Nour, D. Ait-Kadi. (2015) A collocation-based approach to designing remanufacturing closed–loop supply chain network. International Journal of Supply and Operations Management. Vol. 2(3), pp. 820-832.
M. Yokoyama. (2001) Hybrid flow-shop scheduling with assembly operations. International Journal of Production Economics. Vol. 73, pp. 103-116.
M. Yokoyama, DL. Santos. (2005) Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times. European Journal of Operational Research. Vol. 161, pp. 754-770.
ML. Pinedo. Scheduling Theory, Algorithms, and Systems. Third Edition. Springer, USA, 2008.
TCE. Cheng, G. Wang. (1999) Scheduling the fabrication and assembly of components in a two-machine flow shop. IIE Transactions. Vol. 31, pp. 135-143.
P. Fattahi, SMH. Hosseini, F. Jolai, R. Tavakoli-Moghadam. (2014) A branch and bound algorithm for hybrid flow shop scheduling 4 problem with setup time and assembly operations. Applied Mathematical Modelling. Vol. 38, pp. 119-134.
P. Fattahi, SMH. Hosseini, F. Jolai. (2013) A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem. International journal of advanced manufacturing technology. Vol. 65, pp. 787–802.
R. Ruiz, JA. Vazquez-Rodriguez. (2010) Invited Review The hybrid flow shop scheduling problem. European Journal of Operational Research. Vol. 205, pp. 1-18.
T.C.E. Cheng, O. Ding, B.M.T. Lin. (2004) A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research. Vol. 152, pp. 1-13.
Y. Ma, C. Chu, C. Zuo A survey of scheduling with deterministic machine availability constraints. Computers & Industrial Engineering