Document Type : Research Paper
Authors
1 Ablmalek Essadi University, Tétouan, Morocco
2 College of Sciences, Abdelmallek Essaadi University, Tetuan, Morocco
Abstract
Keywords
Main Subjects
Bierwirth, C. & Meisel, F.(2010) A survey of berth allocation and quay crane scheduling problems in container terminals. European Journal of Operational Research, Vol. 202, pp. 615-627.
Chandra Mohan,B. & Baskaran,R. (2012) A survey: Ant Colony Optimization based recent research and implementation on several engineering domain. Expert Systems with Applications, Vol. 39, pp. 4618-4627.
Chen, J .H. Lee, D.-H. & Goh, M. (2014) An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem. European Journal of Operational Research, Vol. 232, pp. 198-208.
Daganzo, C. F. (1989) The crane scheduling problem. Transportation Research Part B : Methodological, Vol. 23, pp. 159-175.
Diabat, A. & Theodorou, E. (2014) An Integrated Quay Crane Assignment and Scheduling Problem. Computers & Industrial Engineering. Vol. 73, pp. 115-123.
Dorigo, M.,Maniezzo, V. & Colorni, A. (1996) Ant system: optimization by a colony of cooperating agent. Systems, Man, and Cybernetics, Part B: Cybernetics, IEEE Transactions on, Vol. 26, pp. 29-41.
Exposito- Izuierdo, C., Gonzalez-Velarde, J.L., Melian-Batista, B. & MARCOS MORENO-VEGA, J. (2013) Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling problem. Applied Soft Computing. Vol. 13, pp. 4063-4076.
Fu, Y.-M., Diabat, A. & Tsai, I. T. (2014) Amulti-vessel quay crane assignment and schedualing problem: Formulation and heuristic solution approach. Expert Systems with Applications, Vol. 41, pp. 6959-6965.
Kaveshgar, N. & Huynh, N. (2014) Integrated quay crane and yard truck scheduling for unloading inbound containers. International Journal of Production Economics.
Kaveshgar, N., Huynh, N. & Rahimian, S. K. (2012) An efficient genetic algorithm for solving the quay crane scheduling problem. Expert Systems with Applications, Vol. 39, pp. 13108-13117.
Keskinturk, T., Yildirim, M. B. & Barut, M. (2012) An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times. Computers & Operations Research, Vol. 39, pp. 1225-1235.
Kim, K. H. & Park, Y.-M. (2004) A crane scheduling method for port container terminals. European Journal of Operational Research, Vol. 156, pp. 752-768.
Lajjam, A., El Merouani, M., Medouri, A. & Tabaa, Y. (2013) Mathematical model for Quay Crane Scheduling Problem with spatial constraints. International Journal of Innovation and Applied Studies, Vol. 4, pp. 547-551.
Lajjam, A., El Merouani, M., Tabaa, Y. & Medouri, A. (2014a) An Efficient Algorithm for Solving Quay Crane Assignment Problem. pp. 13-18.
Lajjam, A., El Merouani, M. & Medouri, A. (2014b) Ant colony system for solving quay crane scheduling problem in container terminal. In: 2nd IEEE Conf. on Logistics Operations Management (Ed. IEEE). Proc IEEE, Rabat, Morocco.
Legato, P., Trunfio, R. & Meisel, F. (2012) Modeling and solving rich quay crane scheduling problems. Computers & Operations Research, Vol. 39, pp. 2063-2078.
Meisel, F. & Bierwirth, C. (2011) A unified approach for the evaluation of quay crane scheduling models and algorithms. Computers & Operations Research,Vol. 38, pp. 683-693.
Moccia, L., Cordeau, J.-F., Gaudioso, M. & Laporte, G. (2006) A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal. Naval Research Logistics (NRL), Vol. 53, pp. 45-59.
Peterkofsky, R. I. & Daganzo, C. F. (1990) A branch and bound solution method for the crane scheduling problem. Transportation Research Part B: Methodological, Vol. 24, pp. 159-172.
Sammarra, M., Cordeau, J.-F., Laporte, G. & Monaco, M. F. (2007) A tabu search heuristic for the quay crane scheduling problem. Journal of Scheduling, Vol. 10, pp. 327-336.
Tavakkoli-Moghaddam, R., Makui, A., Salahi, S., Bazzazi, M. & Taheri, F. (2009) An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports. Computers & Industrial Engineering, Vol. 56, pp. 241-248.
Tavares Neto, R. F. & Godinho Filho, M. (2013) Literature review regarding Ant Colony Optimization applied to scheduling problems: Guidelines for implementation and directions for future research. Engineering Applications of Artificial Intelligence, Vol. 26, pp. 150-161.
Unsal, O. & Oguz, C. (2013) Constraint programming approach to quay crane scheduling problem. Transportation Research Part E: Logistics and Transportation Review, Vol. 59, pp. 108-122.