Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor, Decision Sciences, Vol.17, pp. 292-311.
Ben-Daya, M., and Raouf, A. (1994). Inventory models involving lead time as decision variable, Journal of the Operational Research Society, Vol. 45, pp.579-582.
Chang, H.C., Ouyang, L.Y., Wu, K.S. and Ho, C.H. (2006). Integrated vendor- buyer cooperative inventory models with controllable lead time and ordering cost reduction, European Journal of Operational Research, Vol. 170, pp.481-495.
Coates, E.R. (1996). Manufacturing setup cost reduction, Computers and Industrial Engineering, Vol. 31, pp. 111-114.
Glock C.H. (2012). Lead time reduction strategies in a single vendor-single buyer integrated inventory model with lot size-dependent lead time and stochastic demand. International Journal of Production Economics, Vol. 136, pp. 37-44.
Glock C.H. (2012a ). The joint economic lot size problem: A review. International Journal of Production Economics, Vol. 135, pp. 671-686.
Goyal, S.K. (1976). An integrated inventory model for a single supplier single customer problem, International Journal of Production Research, Vol.15, pp.107-111.
Goyal, S.K. (1988). A joint economic-lot-size model for purchaser and vendor: A comment, Decision Sciences, Vol.19, pp.236-241.
Goyal, S.K. and Nebebe, F. (2000). Determination of economic production-shipment policy for a single-vendor single-buyer system, European Journal of Operations Research, Vol. 121, pp. 175-178.
Goyal, S.K. and Srinivasan, G. (1992). The individually responsible and rational decision approach to economic lot sizes for one vendor and many purchasers: a comment, Decision Sciences, Vol.23, pp. 777-784.
Hall, R.W., zero Inventories, Dow Jones Irwin, Homewood, IL, 1983.
Ho, C.H. (2009). A minimax distribution free procedure for an integrated inventory model with defective goods and stochastic lead time demand, International Journal of Information and Management Sciences, Vol.20, pp.161-171.
Hong, J.D. and Hayya, J.C. (1995). Joint investment in quality improvement and setup reduction, Computers and Operations Research, Vol. 22, pp. 567-574.
Hoque, M.A. (2013). A vendor-buyer integrated production inventory model with normal distribution of lead time. International Journal of Production Economics, Vol. 144, pp.409- 417.
Hoque, M.A. and Goyal, S.K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal size batch shipments between a vendor and a buyer, International Journal of Production Economics, Vol. 102, pp. 217-225.
Hsu, S.L. and Lee, C.C. (2009). Replenishment and lead time decisions in manufacturer retailer chains, Transportation Research Part E, Vol.45, pp. 398-408.
Hwang, H., Kim, D.B. and Kim, Y.D. (1993). Multiproduct economic lot size models with investments costs for setup reduction and quality improvement, International Journal of Production Research, Vol. 31, pp. 691-703.
Keller, G. and Noori, H. (1988). Impact of investing in quality improvement on the lot size model, Omega, Vol. 15, pp. 595-601.
Kim, K.L., Hayya, J.C. and Hong, J.D. (1992). Setup reduction in economic production quantity model, Decision Science, Vol. 23, pp. 500-508.
Liao, C.J., and Shyu, C.H. (1991). An analytical determination of lead time with normal demand, International Journal of Operations & Production Management, Vol.11, pp.72-78.
Moon, I. (1994). Multiproduct economic lot size models with investments costs for setup reduction and quality improvement: Review and extensions, International Journal of Production Research, Vol. 32, pp. 2795-2801.
Moon,I., and Choi,S. (1998). A note on lead time and distributional assumptions in continuous review inventory models, Computers & Operations Research, Vol. 25, pp. 1007-1012.
Nasri, F., Affisco, J.F. and Paknejad, M.T. (1990). Setup cost reduction in an inventory model with finite range stochastic lead times, International Journal of Production Research, Vol. 28, pp. 199-212.
Ouyang, L.Y. and Chang, H.C. (1999). Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process, Production Planning Control, Vol. 11, pp.598-607.
Ouyang, L.Y., Chen, C.K. and Chang, H.C. (1999a ). Lead time and ordering cost reductions in continuous review inventory systems with partial backorders, Journal of the Operational Research Society, Vol. 50, pp. 1272-1279.
Ouyang, L.Y., Wu, K.S. and Ho, C.H. (2004). Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time, International Journal of Production Economics, Vol. 92, pp.255-266.
Ouyang, L.Y., Wu, K.S. and Ho, C.H. (2007). An integrated vendor buyer inventory model with quality improvement and lead time reduction, International Journal of Production Economics, 108, 349-358.
Ouyang, L.Y., and Chuang, B.R. (1999b ). (Q, R, L,) inventory model involving quantity discounts and a stochastic backorder rate, Production Planning & Control, Vol. 10, pp. 426- 433.
Ouyang, L.Y., and Chuang, B.R. (1999c ). A minimax distribution free procedure for stochastic inventory models with a random backorder rate, Journal of the Operations Research Society of Japan, Vol. 42, pp.342-351.
Ouyang, L.Y., and Chuang, B.R. (2000). Stochastic inventory models involving variable lead time with a service level constraint, Yugoslav Journal of Operations Research, Vol. 10, pp.81-98.
Ouyang, L.Y., Chuang, B.R., and Wu, K.S. (1999d ). Optimal inventory policies involving variable lead time with defective items, Journal of the Operational Research Society of India, Vol.36, pp. 374-389.
Paknejad, M. J. and Affisco, J. F. (1987). The effect of investment in new technology on optimal batch quantity, Proceedings of the Northeast Decision Sciences Institute, DSI, RI, USA, 118-120.
Pan, J.C.H. and Yang, J.S. (2004). Just-in-time: an integrated inventory model involving deterministic variable lead time and quality improvement investment, International Journal of Production Research, Vol. 42, pp. 853-863.
Pan, J.C.H. and Yang, J.S.A. (2002). Study of an integrated inventory with controllable lead time, International Journal of Production Research, Vol. 40, pp. 1263-1273.
Pandey, A., Masin, M. and Prabhu, V. (2007). Adaptive logistic controller for integrated design of distributed supply chains, Journal of Manufacturing Systems, Vol.26, pp. 108-115.
Porteus, E.L. (1985). Investing in reduced setups in the EOQ model, Management Sciences, Vol. 31, pp. 998-1010.
Porteus, E.L. (1986). Optimal lot sizing process quality improvement and setup cost reduction, Operations Research, Vol. 34, pp.137-144.
Rosenblatt, M.J. and Lee, H.L. (1986). Economic production cycles with imperfect production processes, IIE Transactions, Vol.18, pp. 48-55.
Schonberger, R. (1982). Japanese Manufacturing Techniques, the Free, New York.
Tang, J., Yung, K.L. and Ip, A. W.H. (2004). Heuristics-based integrated decisions for logistics network systems, Journal of Manufacturing Systems, Vol.23, pp.1-13.
Teng, J.T., Crdenas, B.L.E. and Lou, K.R. (2011). The economic lot-size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation, Applied Mathematics and Computation, Vol. 217, pp. 5972-5977.
Tersine, R. (1994). Principle of Inventory and Material Management, Fourth Edition. Prentice-Hall, USA.
Tsou, C.S., Fang, H.H., Lo, H.C., Huang, C.H. (2009). A study of cooperative advertisings in a manufacturer-retailer supply chain, International Journal of Information and Management Sciences, Vol. 20, pp. 15-26.
Woo, Y.Y., Hsu, S.L. and Wu, S.H. (2001). An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction, International Journal of Production Economics, Vol. 73, pp. 203-215.
Zhang, T., Liang, L., Yu, Y. and Yan, Y. (2007). An integrated vendor-managed inventory model for a two-echelon system with order cost reduction, International Journal of Production Economics, Vol. 109, pp. 241-253.